Vascon Engineers Wins ₹331.38 Crore EPC Contract for Sindhudurg Medical College and Hospital

Vascon Engineers Sindhudurg contract
WhatsApp Group Join Now
Telegram Group Join Now
📷 Instagram Group Follow me

Vascon Engineers Sindhudurg contract

Vascon Engineers Wins ₹331.38 Crore EPC Contract for Sindhudurg Medical College and Hospital

Vascon Engineers has been awarded a significant contract valued at ₹331.38 crore (excluding GST) by the Chief Engineer of the Public Work, Regional Department, Konkan Mumbai, under the Department of Medical Education and Medicine. This contract involves the construction of a medical college with a capacity for 100 students, a 500-bed hospital, and ancillary buildings in Sindhudurg.

Vascon Engineers Sindhudurg contract
Vascon Engineers Sindhudurg contract

Key Project Details:

  • Client: Chief Engineer, Public Work, Regional Department, Konkan Mumbai
  • Project Scope: Construction of a medical college, 500-bed hospital, and ancillary buildings
  • Location: Sindhudurg, Maharashtra
  • Contract Value: ₹331.38 crore (excluding GST)
  • Award Date: 12 August 2024
  • Completion Timeline: 30 months from the receipt of the Letter of Acceptance

EPC Lumpsum Basis: What It Means for the Project

The contract has been awarded on an EPC (Engineering, Procurement, and Construction) Lumpsum basis. This means that Vascon Engineers will be responsible for all aspects of the project, including design, procurement, and construction, with a fixed price agreed upon at the outset. The EPC model ensures that the project is completed within the specified budget and timeframe, minimizing cost overruns and delays.

Vascon Engineers Sindhudurg contract
Vascon Engineers Sindhudurg contract

Timeline and Execution Plan

Vascon Engineers is expected to complete the entire project within 30 months from the date of receiving the Letter of Acceptance, which was issued on 12 August 2024 and received on 13 August 2024. The tight timeline reflects the urgency and importance of the project, which will play a critical role in enhancing medical education and healthcare infrastructure in the Sindhudurg region.

Execution Milestones:

  • Initial Planning and Design: The first few months will focus on detailed project planning, architectural design, and securing necessary permits.
  • Procurement Phase: Vascon Engineers will source high-quality materials and equipment essential for the construction of the medical college and hospital.
  • Construction Phase: The bulk of the work, including the erection of the college, hospital, and ancillary buildings, will be carried out during this phase.
  • Final Inspection and Handover: Upon completion, the project will undergo rigorous inspections before being handed over to the client.
Vascon Engineers Sindhudurg contract
Vascon Engineers Sindhudurg contract

Strategic Importance of the Project

This project is a cornerstone in the development of Sindhudurg’s medical infrastructure. The new medical college and hospital will not only provide advanced medical education to 100 students annually but will also enhance healthcare services in the region through its 500-bed capacity. The hospital is expected to serve as a critical healthcare hub, addressing the medical needs of the local population and reducing the burden on nearby medical facilities.

Impact on Healthcare:

  • Educational Impact: The medical college will contribute to the training of future healthcare professionals, fostering a new generation of doctors and medical staff.
  • Healthcare Services: The 500-bed hospital will provide state-of-the-art medical services, improving access to quality healthcare in the region.

Management’s Perspective

The successful acquisition of this project is a testament to Vascon Engineers’ capabilities in executing large-scale, complex infrastructure projects. The company’s commitment to quality and timely delivery is reflected in their confidence in completing the project within the stipulated timeframe.

Vascon Engineers Sindhudurg contract
Vascon Engineers Sindhudurg contract

Conclusion

Vascon Engineers’ new contract for the construction of a medical college and hospital in Sindhudurg is a significant milestone for both the company and the region. Vascon Engineers Sindhudurg contract, With a strong emphasis on quality, efficiency, and timely execution, this project is poised to enhance medical education and healthcare services in Sindhudurg, setting new benchmarks in the region’s infrastructure development.

FAQs

1.What is the value of the contract awarded to Vascon Engineers?

A. The contract is valued at ₹331.38 crore, excluding GST.

2.What is the scope of the project?

A. The project includes the construction of a medical college with a 100-student capacity, a 500-bed hospital, and ancillary buildings.

3.Where is the project located?

A. The project is located in Sindhudurg, Maharashtra.

4.On what basis was the contract awarded?

A. The contract was awarded on an EPC Lumpsum basis.

5.What is the timeline for the project’s completion?

A. The project is to be completed within 30 months from the date of receipt of the Letter of Acceptance.

6.What is an EPC Lumpsum contract?

A. An EPC Lumpsum contract is where the contractor is responsible for engineering, procurement, and construction, with a fixed price agreed upon at the start.

7.How will this project impact Sindhudurg?

A. The project will enhance medical education and healthcare services in Sindhudurg, benefiting the local population.

8.What are the key milestones in the project execution?

A. The key milestones include planning and design, procurement, construction, and final inspection.

9.Who awarded the contract to Vascon Engineers?

A. The contract was awarded by the Chief Engineer, Public Work, Regional Department, Konkan Mumbai.

10.What are the features of the 500-bed hospital?

A. The hospital will feature state-of-the-art medical facilities to cater to the healthcare needs of the region.

Vascon Engineers Sindhudurg contract

Banking Central: Will Banks Follow Up with Deposit Rate Hikes?

1 comment

Post Comment